Home > Service > technical support >

Inspection before starting up of medium frequency induction furnace

Author:admin      Time:2018-09-08 16:48
Inspection before starting up of medium frequency furnace
1  The worker who operates the automatic feeding of the medium frequency furnace will ensure the safety of the production line, and the automatic control system is sensitive and reliable and the equipment is running normally.
2  The water distributor must be opened before starting up, and the water remaining in the air pipe should be released.
3  The pneumatic control system must be checked for sensitivity and reliability, including manual control mechanism and motor control mechanism. Inspection method: press the manual button and the mobile impact board respectively, and the instructions can control the pressing device flexibly.